Installing a mobile home on a plot is one of the most important stages of the entire realization process. Although the actual installation takes only a few hours, it is preceded by precise preparation, proper logistics and professional planning.
In this article, we present the realization of a Super Arktik® ORIGINAL mobile home, which was installed on a prepared plot. This project is exceptional not only because of the speed of installation, but also thanks to the premium equipment used – the new Insulation PLUS system and a modern vertical façade made of impregnated Nordic pine.
HOW IS A MOBILE HOME INSTALLED ON A PLOT?
One of the greatest advantages of Super Arktik® mobile homes is the speed of their realization directly on the plot. Unlike traditional construction, they do not require a concrete foundation slab or a construction process lasting several months.
With a properly prepared plot, the mobile home can be installed within a few hours and then prepared for connection to utility networks.
Preparing the plot for a mobile home
The foundation of safe and stable installation of a mobile home is a properly prepared base.
Before the mobile home delivery, it is necessary to prepare:
- leveling and adjustment of the terrain,
- a compacted gravel bed,
- ground anchors or concrete support points according to technical documentation,
- preparation of electricity, water and sewage connections.
Proper plot preparation ensures long-term stability of the mobile home and trouble-free use for many years.
Transport of the mobile home to the plot
Transporting a mobile home is a specific logistical operation that requires experience and precise planning.
FISCHER & PARTNERS provides transportation using its own specialized truck transport.
Before the actual transport, we arrange:
- planning of the optimal route,
- obtaining permits for oversized transport,
- checking access roads to the plot,
- safe arrival directly to the installation site.
Thanks to our own logistics, we can manage the entire process – from mobile home production to professional installation directly at the customer’s location.
Installation and leveling of the mobile home
After arriving at the plot, the actual installation of the mobile home takes place.
Depending on the conditions on site, the mobile home is placed:
- directly from the transport chassis,
- or using a crane or other suitable equipment.
The home is then precisely leveled, its stability is checked and it is prepared for final connection to utility networks.
How long does the installation of a mobile home take?
The actual installation of a Super Arktik® mobile home takes approximately 2–3 hours when the plot is properly prepared.
Although the installation itself is fast, a large part of the work takes place before the home arrives on site – during technical preparation, logistics and planning of the entire realization.
ADVANTAGES OF INSTALLING A SUPER ARKTIK® MOBILE HOME
Compared with traditional construction, a mobile home offers several practical advantages:
- no need for a concrete foundation slab,
- significantly faster realization,
- minimal impact on the plot,
- professional transport and installation,
- precise placement according to technical documentation,
- possibility of installation even in more demanding terrain,
- readiness for final connections and use.
INSULATION PLUS – EVEN HIGHER THERMAL COMFORT OF A MOBILE HOME
This Super Arktik® ORIGINAL mobile home was built with the new Insulation PLUS solution, designed for customers with higher requirements for thermal comfort and energy efficiency.
The standard insulation of Super Arktik® mobile homes already provides excellent thermal properties. The walls and floor are insulated with 10 cm of grey graphite EPS, while the roof contains 10 cm of mineral wool.
This construction provides comfortable year-round living, stable indoor temperature and low operating costs.
What does Insulation PLUS provide?
The Insulation PLUS system consists of adding an additional layer of grey graphite polystyrene insulation to the external walls.
The result is:
- higher thermal resistance of the external walls,
- lower heat losses during winter,
- better protection against overheating in summer,
- even more stable indoor climate.
Compared with the standard solution, Insulation PLUS provides approximately 20% higher thermal resistance of the external walls.
It is an optional premium feature for customers who want to achieve maximum comfort from their mobile home.
VERTICAL IMPREGNATED PINE FAÇADE – NATURAL LOOK WITHOUT DEMANDING MAINTENANCE
A distinctive feature of this project is also the new vertical wooden façade made of impregnated Nordic pine.
Wood is one of the most popular facade materials thanks to its natural appearance, timeless elegance and ability to create a pleasant atmosphere.
For customers who want to preserve the beauty of wood while minimizing the need for regular maintenance, impregnated pine is an ideal solution.
Modern wood protection for long-lasting durability
The Nordic pine façade cladding is treated with a combination of:
- vacuum-pressure impregnation,
- oil impregnation with coloured linseed oil.
This technology penetrates deep into the wood structure and provides protection against:
- moisture,
- UV radiation,
- wood-decaying fungi,
- insects,
- cracking and weather conditions.
Main advantages of impregnated pine
- natural appearance of high-quality Nordic wood,
- significantly extended façade lifespan,
- high resistance to rain, frost, wind and sunlight,
- minimal maintenance requirements,
- protection against rot and wood-destroying organisms,
- dimensional stability,
- long-lasting colour stability,
- ecological and environmentally friendly solution.
Impregnated pine brings Super Arktik® mobile homes a combination of natural appearance, modern protection and long-lasting durability.
PHOTO GALLERY OF THE SUPER ARKTIK® MOBILE HOME REALIZATION
View the complete photo gallery of the Super Arktik® ORIGINAL mobile home installation – from plot preparation and transport to the final placement of the mobile home on the site.
SUPER ARKTIK® MOBILE HOME – MODERN YEAR-ROUND LIVING TAILORED TO YOUR NEEDS
This realization demonstrates that a mobile home can be a full-value solution for year-round living, with an emphasis on quality, energy efficiency and modern design.
Thanks to our own production, professional transport and an experienced installation team, we provide a complete process – from mobile home design to final installation directly on your plot.
Interested in a Super Arktik® mobile home? Contact us and we will prepare a solution according to your requirements.
Transport of the mobile home to the site
Transporting a mobile home is a specialised logistical operation that requires experience and precise planning.
FISCHER & PARTNERS provides transport using its own specialised truck transportation.
Before transportation, we take care of:
- planning the optimal route,
- arranging permits for oversized transport,
- checking access roads to the site,
- ensuring safe arrival at the installation location.
Thanks to our own logistics, we can manage the entire process – from manufacturing the mobile home to its final installation at the customer’s property.
Mobile home installation and levelling
After arriving at the site, the actual installation of the mobile home begins.
Depending on the conditions at the location, the mobile home can be positioned:
- directly from the transport chassis,
- or using a crane or other suitable equipment.
The house is then precisely levelled, its stability is checked, and it is prepared for final connection to utility networks.
How long does mobile home installation take?
The actual installation of a Super Arktik® mobile home takes approximately 2 to 3 hours when the site has been properly prepared.
Although the installation itself is fast, a significant part of the work takes place before the home arrives on site – during technical preparation, logistics planning and coordination of the entire project.
Advantages of Super Arktik® mobile home installation
Compared to traditional construction, a mobile home offers several practical advantages:
- no need for a concrete foundation slab,
- significantly faster realisation,
- minimal impact on the site,
- professional transport and installation,
- precise positioning according to technical documentation,
- possibility of installation even on more demanding terrain,
- ready connection to utilities and immediate use.
PLUS Insulation – even higher thermal comfort for a mobile home
This Super Arktik® ORIGINAL mobile home was manufactured with the new PLUS Insulation system, designed for customers who require higher thermal comfort and improved energy efficiency.
The standard insulation system used in Super Arktik® mobile homes already provides excellent thermal performance. The walls and floor are insulated with 10 cm grey graphite EPS insulation, while the roof contains 10 cm mineral wool insulation.
This construction provides comfortable year-round living, stable indoor temperatures and low operating costs.
What does PLUS Insulation provide?
The PLUS Insulation system consists of adding an additional layer of grey graphite EPS insulation into the external walls.
The result is:
- higher thermal resistance of external walls,
- lower heat losses during winter,
- better protection against overheating in summer,
- even more stable indoor climate.
Compared to the standard solution, PLUS Insulation provides approximately 20% higher thermal resistance of the external walls.
It is an optional premium feature for customers who want to get the maximum performance from their mobile home.
INSTALLATION OF A SUPER ARKTIK® MOBILE HOME: FROM SITE PREPARATION TO THE FINISHED PROJECT
Installing a mobile home on a plot is one of the most important stages of the entire realization process. Although the actual installation takes only a few hours, it is preceded by precise preparation, proper logistics and professional planning.
In this article, we present the realization of a Super Arktik® ORIGINAL mobile home, which was installed on a prepared plot. This project is exceptional not only because of the speed of installation, but also thanks to the premium equipment used – the new Insulation PLUS system and a modern vertical façade made of impregnated Nordic pine.
HOW IS A MOBILE HOME INSTALLED ON A PLOT?
One of the greatest advantages of Super Arktik® mobile homes is the speed of their realization directly on the plot. Unlike traditional construction, they do not require a concrete foundation slab or a construction process lasting several months.
With a properly prepared plot, the mobile home can be installed within a few hours and then prepared for connection to utility networks.
Preparing the plot for a mobile home
The foundation of safe and stable installation of a mobile home is a properly prepared base.
Before the mobile home delivery, it is necessary to prepare:
Proper plot preparation ensures long-term stability of the mobile home and trouble-free use for many years.
Transport of the mobile home to the plot
Transporting a mobile home is a specific logistical operation that requires experience and precise planning.
FISCHER & PARTNERS provides transportation using its own specialized truck transport.
Before the actual transport, we arrange:
Thanks to our own logistics, we can manage the entire process – from mobile home production to professional installation directly at the customer’s location.
Installation and leveling of the mobile home
After arriving at the plot, the actual installation of the mobile home takes place.
Depending on the conditions on site, the mobile home is placed:
The home is then precisely leveled, its stability is checked and it is prepared for final connection to utility networks.
How long does the installation of a mobile home take?
The actual installation of a Super Arktik® mobile home takes approximately 2–3 hours when the plot is properly prepared.
Although the installation itself is fast, a large part of the work takes place before the home arrives on site – during technical preparation, logistics and planning of the entire realization.
ADVANTAGES OF INSTALLING A SUPER ARKTIK® MOBILE HOME
Compared with traditional construction, a mobile home offers several practical advantages:
INSULATION PLUS – EVEN HIGHER THERMAL COMFORT OF A MOBILE HOME
This Super Arktik® ORIGINAL mobile home was built with the new Insulation PLUS solution, designed for customers with higher requirements for thermal comfort and energy efficiency.
The standard insulation of Super Arktik® mobile homes already provides excellent thermal properties. The walls and floor are insulated with 10 cm of grey graphite EPS, while the roof contains 10 cm of mineral wool.
This construction provides comfortable year-round living, stable indoor temperature and low operating costs.
What does Insulation PLUS provide?
The Insulation PLUS system consists of adding an additional layer of grey graphite polystyrene insulation to the external walls.
The result is:
Compared with the standard solution, Insulation PLUS provides approximately 20% higher thermal resistance of the external walls.
It is an optional premium feature for customers who want to achieve maximum comfort from their mobile home.
VERTICAL IMPREGNATED PINE FAÇADE – NATURAL LOOK WITHOUT DEMANDING MAINTENANCE
A distinctive feature of this project is also the new vertical wooden façade made of impregnated Nordic pine.
Wood is one of the most popular facade materials thanks to its natural appearance, timeless elegance and ability to create a pleasant atmosphere.
For customers who want to preserve the beauty of wood while minimizing the need for regular maintenance, impregnated pine is an ideal solution.
Modern wood protection for long-lasting durability
The Nordic pine façade cladding is treated with a combination of:
This technology penetrates deep into the wood structure and provides protection against:
Main advantages of impregnated pine
Impregnated pine brings Super Arktik® mobile homes a combination of natural appearance, modern protection and long-lasting durability.
PHOTO GALLERY OF THE SUPER ARKTIK® MOBILE HOME REALIZATION
View the complete photo gallery of the Super Arktik® ORIGINAL mobile home installation – from plot preparation and transport to the final placement of the mobile home on the site.
SUPER ARKTIK® MOBILE HOME – MODERN YEAR-ROUND LIVING TAILORED TO YOUR NEEDS
This realization demonstrates that a mobile home can be a full-value solution for year-round living, with an emphasis on quality, energy efficiency and modern design.
Thanks to our own production, professional transport and an experienced installation team, we provide a complete process – from mobile home design to final installation directly on your plot.
Interested in a Super Arktik® mobile home? Contact us and we will prepare a solution according to your requirements.
Transport of the mobile home to the site
Transporting a mobile home is a specialised logistical operation that requires experience and precise planning.
FISCHER & PARTNERS provides transport using its own specialised truck transportation.
Before transportation, we take care of:
Thanks to our own logistics, we can manage the entire process – from manufacturing the mobile home to its final installation at the customer’s property.
Mobile home installation and levelling
After arriving at the site, the actual installation of the mobile home begins.
Depending on the conditions at the location, the mobile home can be positioned:
The house is then precisely levelled, its stability is checked, and it is prepared for final connection to utility networks.
How long does mobile home installation take?
The actual installation of a Super Arktik® mobile home takes approximately 2 to 3 hours when the site has been properly prepared.
Although the installation itself is fast, a significant part of the work takes place before the home arrives on site – during technical preparation, logistics planning and coordination of the entire project.
Advantages of Super Arktik® mobile home installation
Compared to traditional construction, a mobile home offers several practical advantages:
PLUS Insulation – even higher thermal comfort for a mobile home
This Super Arktik® ORIGINAL mobile home was manufactured with the new PLUS Insulation system, designed for customers who require higher thermal comfort and improved energy efficiency.
The standard insulation system used in Super Arktik® mobile homes already provides excellent thermal performance. The walls and floor are insulated with 10 cm grey graphite EPS insulation, while the roof contains 10 cm mineral wool insulation.
This construction provides comfortable year-round living, stable indoor temperatures and low operating costs.
What does PLUS Insulation provide?
The PLUS Insulation system consists of adding an additional layer of grey graphite EPS insulation into the external walls.
The result is:
Compared to the standard solution, PLUS Insulation provides approximately 20% higher thermal resistance of the external walls.